Boiler Control System Quote Request

Use this form if you're note sure which SteamPAK package(s) you need, or for a customized system. If you know which SteamPAK package(s) you would like us to quote, use the SteamPAK Quote Request form.
First Name*

Last Name*

Company*  
Address*

City*

State*

Postal Code*

Country*

Phone*

Fax

Email*
  *required fields
 
Boiler #1:

Boiler Type:

Maximum Boiler Capacity (size or load)
Lbs/hour BHP

Steam Type

Number of burners: 1 2 3 4 more than four

Fuel Type (select all that apply):
Natural gas
No. 2 oil
No. 6 oil
Coal (stoker)
Coal (pulverized)
Bagasse
Other (please specify)

Current combustion control strategy:
Single point positioning / jackshaft
Parallel positioning, no O2 trim
Parallel positioning with O2 trim
Full metered, no O2 trim
Full metered with O2 trim
Not sure

Current drum level / feedwater control:
Single-element (level measurement only)
Two-element (level & steam measurement)
Three-element (leve, steam & feedwater flow measurement)
Not sure

Desired combustion contol control strategy:
None
Single point positioning / jackshaft
Parallel positioning, no O2 trim
Parallel positioning with O2 trim
Full metered, no O2 trim
Full metered with O2 trim
Not sure, need some help with selection

Desired drum level control:
None
Single-element
Two-element
Three-element
Not sure, need some help with selection

Do you require an online efficiency calculation for the combustion control system? Yes No
Do you require new field instrumentation (transmitters, flow elements, O2 analyzer)? Yes No
If you select "yes", we will contact you regarding models and ranges.

Efficiency calculation information (optional)
If you would like us to estimate efficiency improvement, please provide the following (leaving this section blank will not prevent you from receiving a quotation):

Daily fuel consumption (if known):
please include units

Average Load (%):

Daily usage (hours):

Annual usage (days):

Current excess O2 %

Current stack temperature DEG F or DEG C

Fans:

FD Fan Motor HP Voltage RPM

ID Fan Motor HP Voltage RPM

 

Request a quote for another boiler?     

 

Boiler #2:

Boiler Type:

Maximum Boiler Capacity (size or load)
Lbs/hour BHP

Steam Type

Number of burners: 1 2 3 4 more than four

Fuel Type (select all that apply):
Natural gas
No. 2 oil
No. 6 oil
Coal (stoker)
Coal (pulverized)
Bagasse
Other (please specify)

Current combustion control strategy:
Single point positioning / jackshaft
Parallel positioning, no O2 trim
Parallel positioning with O2 trim
Full metered, no O2 trim
Full metered with O2 trim
Not sure

Current drum level control:
Single-element
Two-element
Three-element
Not sure

Desired combustion contol control strategy:
None
Single point positioning / jackshaft
Parallel positioning, no O2 trim
Parallel positioning with O2 trim
Full metered, no O2 trim
Full metered with O2 trim
Not sure, need some help with selection

Desired drum level control:
None
Single-element
Two-element
Three-element
Not sure, need some help with selection

Do you require an online efficiency calculation for the combustion control system? Yes No
Do you require new field instrumentation (transmitters, flow elements, O2 analyzer)? Yes No
If you select "yes", we will contact you regarding models and ranges.

Efficiency calculation information (optional)
If you would like us to estimate efficiency improvement, please provide the following (leaving this section blank will not prevent you from receiving a quotation):

Daily fuel consumption (if known):
please include units

Average Load (%):

Daily usage (hours):

Annual usage (days):

Current excess O2 %

Current stack temperature DEG F or DEG C

Fans:

FD Fan Motor HP Voltage RPM

ID Fan Motor HP Voltage RPM

 

Request a quote for another boiler?     

Boiler #3:

 

Boiler Type:

Maximum Boiler Capacity (size or load)
Lbs/hour BHP

Steam Type

Number of burners: 1 2 3 4 more than four

Fuel Type (select all that apply):
Natural gas
No. 2 oil
No. 6 oil
Coal (stoker)
Coal (pulverized)
Bagasse
Other (please specify)

Current combustion control strategy:
Single point positioning / jackshaft
Parallel positioning, no O2 trim
Parallel positioning with O2 trim
Full metered, no O2 trim
Full metered with O2 trim
Not sure

Current drum level control:
Single-element
Two-element
Three-element
Not sure

Desired combustion contol control strategy:
Single point positioning / jackshaft
Parallel positioning, no O2 trim
Parallel positioning with O2 trim
Full metered, no O2 trim
Full metered with O2 trim
Not sure, need some help with selection

Desired drum level control:
Single-element
Two-element
Three-element
Not sure, need some help with selection

Do you require an online efficiency calculation for the combustion control system? YES NO
Do you require new field instrumentation (transmitters, flow elements, O2 analyzer)? YES NO
If you select "yes", we will contact you regarding models and ranges.

Efficiency calculation information (optional)
If you would like us to estimate efficiency improvement, please provide the following (leaving this section blank will not prevent you from receiving a quotation):

Daily fuel consumption (if known):
please include units

Average Load (%):

Daily usage (hours):

Annual usage (days):

Current excess O2 %

Current stack temperature DEG F or DEG C

Fans:

FD Fan Motor HP Voltage RPM

ID Fan Motor HP Voltage RPM

 

Plant Master

Do you require a quote for a Plant Master? YES NO

Will the SteamPAK combustion controls be hardwired to an existing Plant Master? YES NO

Burner Management System

Are you adding / upgrading / replacing a BMS? YES NO

Would you like a quotation for a MicroMod BMS? YES NO

Additional information, comments or feedback:

 

Clear the form and start again:

Submit your quote request to MicroMod's boiler experts:

MicroMod Automation • 75 Town Centre Drive Rochester, NY 14623, USA

Phone: 585-321-9200 • Fax: 585-321-9291 •
In the U.S. call toll free 1-800-480-1975